2

February 19, 2018: *** In a newly-released listing by NEDA, 4 Bohol projects worth P229-B are included in the 75 listed-priority projects which include: P124.150-B Cebu-Bohol Link Bridge, the P96.280-B Bohol-Leyte Link Bridge, the P4.134-B Bohol Northeast Basin Multipurpose Project and P4.570-B project for additional facilities in the New Panglao Bohol Airport. ***NEDA Sec. Ernesto Pernia said DENR Sec. Roy Cimatu will personally come to Bohol to assess the present condition of the resorts in Panglao especially after reports surfaced in the coliform contamination especially along the Alona beach area. *** Boholano National Economic Development Sec. Ernesto Pernia relayed that Panglao is next target of President Duterte's marching orders to save the country's prime tourist destinations from further environmental destruction. *** The Japan International Cooperation Agency (JICA) has kicked off the study of the proposed long span bridges that would link Southern Leyte to Bohol and Surigao, according to the Department of Public Works and Highways here.

Search This Blog

Monday, October 25, 2010

Klase sa Octobre 26 suspendido - DepED

ARON makapahuway ang mga magtutudlo nga nag-alagad isip Board of Election Tellers sa dungan nga piliay sa Barangay ug Sangguniang Kabataan, ipasuspenso sa Department of Education and klase sa elementarya ug high school ugma, Octubre 26.

Pinaagi sa ilang opisyal nga twitter account, ang DepED mipadayag nga ang pagsuspenso sa klase agi og pagsabot sa mga magtutudlo nga lapoy sa pag-alagad sa eleksyon.

Dugang niini, sa mga lugar diin na-oktaba ang piliay hangtud ugma tungod sa pagkalangan sa pag-abot sa mga himan sa eleksyon, ipadayon ang ilang walay klase taman sa Miyerkoles.

Kahinumduman nga una nga mipagawas ang Palasyo og mandu alang sa espeyal nga holiday sa Octubre 25, aron makahigayon ang tanang katawhang Pinoy sa pagtuman sa ilang politikanhong katungod sa pagpili. (PIA)

==============

Delayed paraphernalia delivery noted in Bohol

Many of Bohol polling prescincts fail to open up on time as election paraphernalia arrived late and some of these election materials were still apparently en route from the city as of 8:00 AM.

This even as Commission on Election (Comelec) in Manila reportedly completed the delivery of election paraphernalia as early as 2:00 PM of October 24, 2010.

In Bohol, many of such materials however arrived this 4:00 AM on election day, and apparently couldn’t make it in time for the supposed simultaneous poll opening at 7:00 AM.

Bohol Comelec Supervisor Eliseo Labaria, in radio intervies confirmed earlier monitoring reports that polls in some areas may be delayed.

Media reported that poll officials were still gathered at the municipal hall in several towns as late as 6:00 AM to pick their poll paraphernalia.

With the arrival of poll materials at 4:00, Labaria added that these have to be sent to the sent to the different towns as immediately as they can.

In a radio interview at around 6:00 AM, Atty Labaria said that...click local news

No comments:

Contact Us

Philippine Information Agency
Bohol Information Center
LMP Building, K of C Drive, Poblacion II, Tagbilaran City
Telephone Numbers (038) 412-2292, 501-8554

Visitors